Taza I Wind Farm

Installation of the 81 MW Taza I wind farm: 27 GE wind turbines in the Taza region.

81 MWtotal capacity
27GE turbines
3.2 MWper turbine
85 mhub height
130 mrotor diameter

SOMALEV installed 27 GE wind turbines, each rated at 3.2 MW, with an 85 m hub height and a 130 m rotor diameter.

Lifting engineering and handling were delivered through PSA Wind Services, our joint venture with Paradiso Fratelli. A 1,200 t Liebherr LTM 11200 served as the main crane. The project was developed by EDF Renouvelables and Mitsui in partnership with ONEE and Masen.